Testing & Commissioning Of CCTV Camera – Method Statement

The objectives of the process of testing and commissioning of CCTV camera is to verify proper functioning of the equipments and system after installation, and to ensure the performance of the installed system meets the specified design intent through a series of tests and adjustments. Finally to capture and record performance data of the whole installation as the baseline for future operation and maintenance.

Preparation & Pre Testing & Commissioning Work: Before start of testing & commissioning the completeness of the system shall be ensured by physical inspections and interpreting the previously submitted and approved work inspection reports/records.

Pre-commissioning of  CCTV Cameras

Pre-commissioning Of Analogue Camera

Commissioning of Fixed Dome IP Cameras

Commissioning of Analogue Camera with Encoder

Testing of CCTV Cameras

Camera function, coverage and quality can be checked from the desktop client software, select the camera and verify the picture quality.