Quality Control in Road Construction Works

asphalt paving method statement

Quality control of construction materials and product is an essential requirement for obtaining improved and uniform standard of road construction.

Quality Control is an essential part of any production process and highway constructions are no exception. The need for quality control on these specifications has increased considerably in recent times due to a significant increase in traffic intensities.

Improved level of service of roads & highways will result in considerable savings in vehicle operating cost and in favorable road user reaction and public opinion.

The extra cost of exercising quality control being only a fraction of the resulting benefits.

The cost of exercising quality control would be 1-2 percent of the total construction cost.

The direct and indirect economic return from quality control could be of the order of 5 to 10 percent of the total construction cost.

Pre requisite for Road Construction Quality Control

Mainly road construction specifications and estimates provide basis for effective quality control. In addition organizations setup quality management systems, adequately trained staff and good monitoring agency for exercising quality control.

Establish periodic appraisal of the quality control data not only for implementation during construction but also for effecting possible improvements in quality control and the construction techniques.

Another approach is updating of knowledge by improving the culture of on job training.

Types of Quality Control

Process Quality Control – the designer makes the decisions regarding the type of equipment, the procedure of construction and the amount of work required to obtain the desired result.

End quality control-In the end result type of quality control, the construction agency, which may be a private contractor, has a free hand in the selection of road  construction methods and equipment to achieve the desired end product.

In the ‘End result’ type of specification, the field engineering personnel carry out tests on finished work at regular intervals to evaluate whether it meets the specification requirements or not whereas in the ‘Process type control’, the responsibility of field personnel is to make sure that the work is carried out as per laid down specifications.

Quality Control of Construction Materials

Quality controls tests on materials at project site are essential to ensure that the materials being incorporated in the construction are of specified quality.

All the materials brought to the site shall be stacked and stored as specified so as to prevent deterioration or intrusion by foreign matter and to ensure the preservation of their quality and fitness for work.

Materials which have been improperly stored or have been stored for long periods shall be re-tested where their suitability in the work is doubtful.

Testing Procedures

The procedure for testing of different materials and work shall be in accordance with the relevant standards and specifications. Where specific procedure of testing is not indicated the tests shall be carried out as per the prevalent practice to the direction of the Engineer-in-Charge.

Frequency & Extent of Site Testing

The frequency and extent of testing is the minimum considered necessary for normal conditions.

Carryout additional testing for abnormal conditions where variations may be excessive or where circumstances so warrant otherwise.

Site Acceptance Criteria

Acceptance criteria for different items of work may be based on minimum values or the statistical analysis as is considered judicious. For effective road construction quality control of materials and work, it will usually be necessary to lay down the acceptance criteria in the contract documents.

Quality Control Training

In order to bring awareness in the officers of department and to update their knowledge of methods of testing, regular workshops on quality control should be held.

To make the participants aware of basic necessities like specifications, required test acceptance criteria, frequency of testing and methodology of tests for understanding the quality control system and operation of regional/field laboratories.

The training could be imparted by known road research institutes or through on job training.

Project Site Testing Facilities

Testing facilities normally comprise laboratories at Central, Regional and Field levels.

The Regional laboratories are at circle level and headed by Executive Engineers (Quality Control)

In addition, they shall provide all facilities for training of all the Quality Control Staff in the Region.

Recording of Test Results

The tests shall be carried out in accordance with the standard procedures. It is desirable that of the total tests, 70 percent are carried on by the Junior Engineer, 20 percent by the Executive Engineer and the remaining 10 percent by the Executive Engineer.

The test result record registers shall be maintained regularly linked with the assured quality of work.

Critical Parameters for Road Construction Quality Control

The following points for construction in-process quality control shall be properly attended to:

Concrete Pavement Quality Control

Construction of concrete pavements shall in general follow the guidelines given in IRC:15-2002.

“Standard Specifications and Code of practice for construction of concrete Roads”

For tools, equipments and appliances reference should be made to IRC:43-1972 “Recommended Practice for Tools, equipments and Appliances for Concrete Pavement Construction.

Mix proportions for concrete shall be pre-determined on strength basis as per guidelines IRC:44-1972 and IRC:59-1976 .

Quality Control Tests on Materials

Cement Physical & Chemical Tests IS:269-1967
Coarse and Fine

Aggregates

Gradation IS:2386 (Part – I, 1963)
Deleterious

Constituents

IS:2386 (Part – II, 1963)
Moisture Content IS:2386 (Part – III, 1963)
Bulking of fine Aggregate IS:2386 (Part – II, 1963)
Coarse Aggregate Los Angeles Abrasion Value/ Aggregate Impact Value Test IS:2386 (Part – IV: 1963)
Soundness IS:2386 (Part – V, 1963)
Alkali Aggregate Reactivity IS:2386 (Part – V, 1963)
Water Chemical Tests IS:425-1964

 

Control Of Concrete Strength
Test Test Method
Workability of fresh concrete IS:1199-1950 (One test per 10m3)
Concrete Strength IS:516-1959 (3 cube/beam samples as specified for each age of 7 days and 28 days for every 30m3 of concrete)
Core strength on hardened concrete IS: 516-1959 (2 cores for every 30m3 of concrete)

Critical Factors in Quality of Concrete Design

Mostly the design is not the contractors responsibility. However, where the contractor is also to supply the design, the Quality Assurance Management (QAM)should include the agreed procedures for the items listed below to achieve QC/QA in design.

Preparation and approval of Quality design and approval of design

This includes:
– QA on software (Prior testing and Verification)
– Design preparation
– Design Verification (independent review, alternative analysis and quality control testing)
– Control of manufacturers/vendors design.
– Approval to design, distribution of design documents and document control.
– Design change requests
– Checking and approval by external approving authority, if any.
– Audit and Corrective Actions
– Design documentation records
– Proforma of Quality Design Records- Exhaustive & detailed proforma will have to be evolved and prescribed for the above purpose for each of the major highway to suit the special requirements, which form a part of the quality assurance manual for the project.