Method Statement For Testing & Commissioning Of Vacuum System

Below is the list of equipment that you will need to perform the installation, testing & commissioning of Vacuum System.

Sequence Of Work

COMMISSIONING PROCEDURE.

Pump Rotation

General Operation.

 Electrical Control Panel.

Relief Valve

Tank Drain

Emergency Shutdown/Alarms.

Vacuum Switch Set Point Adjustments

The vacuum switch is set at the factory to the operating point as given in the below table.

VACUUM SWITCH SETTINGS
VS-1 VS-2 VS-3 VS-4 RELEIF VALVE SETTINGS
19-21” hg 18-20” hg 17-19” hg 16-18” hg 23

 