Concrete Placing, Curing and Defect Rectification Method Statement

Below is a brief method statement that describes the practices and methods with regards to concrete placing, curing and defect rectification.

Below is list of reference documents useful for this method statement.

Methods of Concrete placing, curing and defect rectification

Concrete Placement:

Complete all quality control checks before placing of any concrete and obtain the “approval to concrete” instruction from the client.

After delivery at site, place the concrete in one of three manners:

  1. Direct (or chute) discharge,
  2. Crane and bucket, or
  3. Concrete pump

The method of concrete placement depends on site conditions and pour volume.

Place the concrete in accordance with the specification for concrete cast in place. Following are some main points to consider:

Curing of Concrete in Place

After the initial set of the concrete and when the concrete is hard enough to not be damaged by such an action, the exposed concrete surface shall be covered with drenched hessian sacks.

These sacks shall be left in position and maintained in a soaked condition for seven days.

For formed surfaces apply the curing as above after the removal of formwork, or apply a curing compound. Make sure to use the curing compounds as per the client approval and ensure it is of the clear type.

Finishing of Building Construction Joints

Inspection & Concrete Repair