Method Statement For Formwork

The purpose of this document is to lay down the systematic procedures for the various activities required for FORM WORKS  to ensure that all works are carried out in accordance with the approved shop drawings and contract specification. This method statement is a general outline for fabrication and use of formwork for the project.

Reference documents and standards.

Definitions and abbreviations

PM:                              Project Manager

CM:                               Construction Manager

PE:                               Project Engineer

QCE:                           Quality Control Engineer

SE:                               Site Engineer

QA QC:                       Quality Assurance and quality Control

PPE:                            Personal Protective Equipment

HSE:                            Health, Safety and Environment

Responsibilities

EQUIPMENT & TOOLS

The capacity / size of the above tools and equipment shall be judged in accordance with site conditions, requirements, and availability at the time of execution

SAFETY & HEALTH

Safety of the personnel and properties is to be given prime importance and all the works to be carried out without causing any accidents or property damages. Formworks involve the following activities:

Adequate access and egress should be provided to the site for work. All the personnel should wear basic personnel protective equipments. All the equipments, tools and tackles being used for the work should be in good working condition and maintained. All the personnel will be provided with toolbox talk on the procedures to execute the work safely.

Necessary risk assessment of the activities is reflected in the enclosed risk assessment.

Formwork Procedure

ATTACHMENTS