Site icon Method Statement HQ

Download Method Statement For Installation Of HVAC Dampers, VCD, Motorized VCD & Fire Dampers

Method Statement For Installation Of

HVAC Dampers (VCD, Motorized VCD,

Fire Damper, Fire Rated Motorized Damper,

Smoke Motorized Damper)

Download package contains the Method Statement +

Checklist for Installation +

Inspection & Testing Plan +

 Risk Assessment

 

You only need to change project name and

insert logos etc and the same shall be

ready to be submitted for approval from consultant/clients.

Below is the list of files that are included in download package.

 

 

The files are in Word/Excel formats and instantly available after you pay the cost of only 2.99$.

 Download Method Statement with Checklists, ITP & Risk Assessment

Click Below “Buy Now” link and Download Instantly.






Exit mobile version