This method statement covers the testing, pre-commissioning, commissioning, functional verification, performance testing, and final acceptance of H₂S scrubber systems.
The scope includes all associated mechanical, process, piping, instrumentation, electrical, control, and SCADA systems.
Applicable Systems
- Chemical Packed Bed H₂S Scrubbers
- Activated Carbon Scrubbers
- Dry Media Scrubbers
- Bio-Scrubbers
- Biological Trickling Filters
- Multi-Stage Scrubbers
- FRP Odor Control Units
- Stainless Steel Scrubber Systems
- Modular Scrubber Units
- Containerized Odor Control Systems
Download Package Contains:
- Method Statement
- Inspection and Test Plan ITP
- Checklists for Pre Commissioning
- Checklists for Commissioning
- Risk Assessment