Site icon Method Statement HQ

Download Method Statement for Installation of CCTV Closed Circuit Video Surveillance TV System

Download Method Statement for Installation of CCTV Closed Circuit Video Surveillance TV System.

Download package contains the Method Statement + Checklists for Installation + Inspection & Testing Plan + Risk Assessment.

 

You only need to change project name and

insert logos etc and the same shall be

ready to be submitted for approval from consultant/clients.

Below is the list of files that are included in download package.

The files are in Word/Excel formats and instantly

available after you pay the cost of only 2.99$.

 

Download Method Statement with Checklists, ITP & Risk Assessment

Click Below “Buy Now” link and Download Instantly.






Exit mobile version