Introduction
This method statement describes the installation procedure for Air Handling Units (AHU) including preparation, installation, inspection, testing and commissioning.
Purpose
To ensure installation complies with project specifications, approved shop drawings and manufacturer recommendations.
Scope
Applicable to all AHU installations on the project.
References
- Project Specifications
- Approved Shop Drawings
- Manufacturer Instructions
Responsibilities
Project Manager
Site Engineer
QA/QC Engineer
HSE Officer
Materials
Air Handling Unit
Supports
Anchor Bolts
Fasteners
Tools & Equipment
Chain Block
Lifting Equipment
Spirit Level
Torque Wrench
Safety Requirements
Wear PPE.
Follow approved Risk Assessment.
Use certified lifting equipment.
Installation Procedure
Describe installation steps here.
Inspection & Testing
Check alignment.
Verify supports.
Complete inspection checklist.
Quality Requirements
Inspection Request
Testing Records
QA/QC Approval
Environmental Requirements
Dispose packing material properly.