Method Statement HQ > Documents > Method Statement for Installation of Air Handling Unit (AHU)
📄 Method Statement 🔄 Rev.0 📌 Version 1.0 ⭐ Featured

Introduction

This method statement describes the installation procedure for Air Handling Units (AHU) including preparation, installation, inspection, testing and commissioning.

Purpose

To ensure installation complies with project specifications, approved shop drawings and manufacturer recommendations.

Scope

Applicable to all AHU installations on the project.

References

  • Project Specifications
  • Approved Shop Drawings
  • Manufacturer Instructions

Responsibilities

Project Manager

Site Engineer

QA/QC Engineer

HSE Officer

Materials

Air Handling Unit

Supports

Anchor Bolts

Fasteners

Tools & Equipment

Chain Block

Lifting Equipment

Spirit Level

Torque Wrench

Safety Requirements

Wear PPE.

Follow approved Risk Assessment.

Use certified lifting equipment.

Installation Procedure

Describe installation steps here.

Inspection & Testing

Check alignment.

Verify supports.

Complete inspection checklist.

Quality Requirements

Inspection Request

Testing Records

QA/QC Approval

Environmental Requirements

Dispose packing material properly.

Download Information

Download PDF below.

Frequently Asked Questions

Coming soon.


Discover more from Method Statement HQ

Subscribe to get the latest posts sent to your email.



Scroll to Top