Method Statement For Installation & Erection Of Building Hoist

Hoist is a Rack and Pinion lift that is useful on construction site for transportation of personnel and materials. It is installed and dismounted conveniently and can grow as high as the building grows in height. Hoist has reliable electrical and mechanical safety device. It is efficient and safe vertical transporting equipment.

Following tools shall be arranged before the installation work starts:

Preparation before Installation of Hoist

Installation of Hoist Cage

Dismounting method: make note then dismount the two pins. Loose the two nuts parallel until the brake loose and the brake disc can ‘be rotated.

Installation of Twin Cage Hoist

Dismounting method: make note then dismount the two pins. Loose the two nuts parallel until the brake loose and the brake disc can be rotated.

Adjustment After the Installation

Installation of Lifting Device

Put the lifting device into the position pin the cage roof, (You should connect power for electric lifting device).

Erection of the Mast

Installation of Tie-in Type III

Installation of Counterweight

Installation of Top wheel and Rope

Installation of Cable Guiding Device

Installation of Landing Door

Pre Operation Procedure: