Download Method Statement for installation Of LV Power Cables and Wires.
Method statement is for indoor and outdoor applications including underground installation of Cables & Wires, which can be downloaded immediately by paying a very nominal fees.
Download package contains:
- Installation Method Statement
- Checklist for External Installation
- Checklist for Internal Installation
- Inspection & Test Plan
- Risk Assessment.
You only need to change project name, insert logos and the document shall be ready for submission and approval from consultant/clients.
The files are in word/excel format and instantly available after you pay the cost of only 2.99$.
Below is the list of files that are included in download package.
<img src=”https://s3.amazonaws.com/images.ecwid.com/images/wysiwyg/product/7335217/52954866/1470759616756637272381/Method_Statement_for_Installation_Of_LV_Power_Cables_and_Wires_png” alt=”” “=””>
Download Method Statement For Installation of LV Cables & Wires with Checklists, ITP & Risk Assessment.





