Now you can download Method Statement for Testing & Commissioning Of Lighting Control System LCS in editable format.
The download package contains:
- Method Statement
- Checklist for Precommissioning
- Checklist for Commissioning
- Inspection & Testing Plan
- Quality Control Procedure QCP
- Risk Assessment
The files are in Word/Excel formats and instantly available after you pay the cost of only 2.99$.
You only need to change project name, insert logos and the document shall be ready for submission and approval from consultant/clients.
Below is the list of files that are included in download package.

Download Method Statement with Checklists, QCP, ITP & Risk Assessment





