Download Method Statement for Installation, Testing and Commissioning of External Fire Hydrant.
Download Package Contains:
- Method Statement
- Checklists for Installation, testing & commissioning
- Inspection & Testing Plan
- Risk Assessment
You only need to change project name and insert logos etc. and the same shall be ready to be submitted for approval from consultant/clients.
The files are in Word/Excel formats and instantly available after you pay the cost of only 2.99$.
Below is the list of files that are included in download package.
<img src=”https://s3.amazonaws.com/images.ecwid.com/images/wysiwyg/product/7335217/52987925/1470767022004-517099226/Method_Statement_Fire_Hydrant_Installation_Testing_Commissioning_png” alt=”” “=””>
Download Method Statement with Checklists, ITP & Risk Assessment





