Download Method Statement for drainage pipes installation & Leak Testing (Above and underground).
Download Pack Includes:
- Method Statement
- ITP for drainage piping installation
- Installation checklist
- Leak Test Sheet
- Risk Assessment
You only need to change project name, insert logos and the document shall be ready for submission and approval from consultant/clients.
The files are in word/excel format and instantly available after you pay the cost of only 2.99$.
Below is a snapshot showing the content of the download package.
<img src=”https://s3.amazonaws.com/images.ecwid.com/images/wysiwyg/product/7335217/52987695/1470766505536999753730/Method_Statement_For_Installation_Of_Drainage_Piping_png” alt=”” “=””>
Download Method Statement For Installation & Testing of Drainage Piping





