Method of Soil Backfill of Trenches

This method statement describes a proper work procedure shall be carried out during the backfill Work of soil. Earthwork forms a part of the installation procedures of box culverts, retaining walls, foundations, and substructures.

In order to ensure an adequate foundation for such structures, backfill material must meet certain specifications and be compacted by acceptable methods to adequate density.

The use of poor soils as a bed for a structure and the failure to adequately compact soils surrounding any foundation can lead to premature failure.

Backfill shall be of acceptable quality, free from large or frozen lumps, wood or other foreign material. No backfill shall be placed against a concrete abutment, wing wall or reinforced concrete box culvert until concrete has been in place at least 14 calendar days. 

Materials: Natural soil

Tools & Equipment :

Backfill Procedure

Backfill Tests

Field density test shall be performed on the final compacted layer of soil. All the field density tests shall be performed in the presence of Engineer or representative.

Above Procedure will be followed as per consultant/client approval.