Site icon Method Statement HQ

Download Method Statement for Installation of Underground Electrical Duct Banks and Sleeves

 Download package contains the Method Statement +

Checklist for Sleevs +

Checklist for Duct Banks +

Inspection & Testing Plan +

Quality Control Procedure QCP +

 Risk Assessment

 

You only need to change project name and

insert logos etc and the same shall be

ready to be submitted for approval from consultant/clients.

Below is the list of files that are included in download package.

Download from below Link:

Exit mobile version