The installation of underground electrical duct banks and sleeves shall be carried out by qualified personnel using approved materials, equipment, and procedures in accordance with approved drawings, utility authority requirements, project specifications, and applicable international standards.
Continuous inspection, testing, quality assurance, and safety monitoring shall be maintained throughout the execution of the works to ensure a reliable, durable, and fully compliant underground electrical infrastructure capable of accommodating future cable installations and long-term operational requirements.
Download method statement for Installation Of Underground Electrical Duct Banks and Sleeves.
The download package contains:
- Method Statement
- Checklist for Sleeves
- Checklist for Duct Banks
- Inspection & Testing Plan
- Quality Control Procedure QCP
- Risk Assessment
The files are in Word/Excel formats and instantly available after the payment.
You only need to change project name, insert logos and the document shall be ready for submission and approval from consultant/clients.
Below is the list of files that are included in download package.
Download Method Statement with Checklists, QCP, ITP & Risk Assessment


