This method statement covers the installation of H₂S scrubber systems used in wastewater treatment plants, pumping stations, sewage treatment facilities, sludge handling areas, industrial process facilities, and odor control applications.
The scope includes installation of scrubber vessels, ductwork, fans, piping systems, chemical dosing equipment, instrumentation, electrical systems, controls, and Building Management System (BMS) or SCADA interfaces where applicable.
Download Package Contains:
- Method Statement
- Checklist for Installation
- Inspection & Testing Plan
- Risk Assessment
