Sleeves & Puddle Flanges Installation Method Statement Package – Download Editable Files

$2.99

Immediate delivery in your email after payment.
Guaranteed Safe Checkout

The purpose of this method statement is to define the procedure for the supply, fabrication, installation, inspection, and protection of sleeves and puddle flanges required for piping systems passing through concrete walls, slabs, foundations, water retaining structures, and underground structures. The objective is to ensure proper pipe penetration arrangements, maintain structural integrity, prevent water ingress, and comply with project specifications, approved shop drawings, and consultant requirements.

Download Method Statement for Installation of Sleeves & Puddle Flanges in editable format.

Download Package Contains:

  • Method Statement
  • Checklist Installation
  • Inspection & Testing Plan
  • Risk Assessment

You only need to change project name, insert logos and the document shall be ready for submission and approval from consultant/clients.

The files are in Word/Excel formats and instantly available.

Below is the list of files that are included in download package.

Download Method Statement with Checklists, ITP & Risk Assessment


Discover more from Method Statement HQ

Subscribe to get the latest posts sent to your email.

Sleeves & Puddle Flanges Installation Method Statement Package - Download Editable Files $2.99 Download Now
Sleeves & Puddle Flanges Installation Method Statement Package - Download Editable FilesSleeves & Puddle Flanges Installation Method Statement Package – Download Editable Files
$2.99
Scroll to Top