The purpose of this Method Statement is to establish the procedures, quality requirements, safety precautions, testing methodology, commissioning activities, and acceptance criteria for the installation, testing, and commissioning of Multimedia Water Filtration Systems.
The objective is to ensure that the filtration system is installed in accordance with approved shop drawings, project specifications, manufacturer recommendations, and applicable water treatment standards to provide reliable filtration and removal of suspended solids, turbidity, sediment, and particulate contaminants from the water supply.
Download Method Statement For Installation & Testing Of multimedia water filtration system.
Download Package Contains:
- Method Statement
- Checklist for Installation
- Checklist for Pipe Pressure Testing
- Inspection & Testing Plan
- Risk Assessment
You only need to change project name, insert logos and the document shall be ready for submission and approval from consultant/clients.
The files are in Word/Excel formats and instantly available.
Below is the list of files that are included in download package.
Download Method Statement with Checklists, ITP & Risk Assessment


