The installation of Flush Floor Trunking Systems shall be performed by qualified personnel using approved materials and installation practices in accordance with IEC standards, BS EN 50085 requirements, project specifications, and manufacturer recommendations.
Proper coordination with civil and architectural works, together with rigorous inspection and testing procedures, shall ensure a safe, durable, accessible, and fully functional floor distribution system ready for commissioning and handover.
Now you can download Method Statement for Installation of Flush Floor Trunking System.
The download package contains:
- Method Statement
- Checklists for Installation
- Inspection & Testing Plan
- Risk Assessment
The files are in Word/Excel formats and instantly available after the payment.
You only need to change project name, insert logos and the document shall be ready for submission and approval from consultant/clients.
Below is the list of files that are included in download package.
Download Method Statement with Checklists, ITP & Risk Assessment
Â


