The purpose of this Method Statement is to define the procedures, responsibilities, quality requirements, safety precautions, inspection criteria, and installation methodology for the supply and installation of Chiller Plant Manager (CPM) field devices associated with the optimization and control of the chilled water plant.
The objective is to ensure that all CPM field devices are installed safely and correctly in accordance with approved shop drawings, manufacturer recommendations, project specifications, control philosophies, and applicable international standards to enable efficient monitoring, optimization, sequencing, and control of the central chilled water plant.
Download Method Statement For Installation Of Field Devices for Chiller Plant Manager.
The download Package Contains:
- Method Statement
- Checklist for Installation
- Inspection & Testing Plan
- Risk Assessment.
The files are in Word/Excel formats and instantly available after the payment.
You only need to change project name, insert logos and the document shall be ready for submission and approval from consultant/clients.
Below is the list of files that are included in download package.
Download Method Statement with Checklists, ITP & Risk Assessment


