The purpose of this Method Statement is to establish the procedures, responsibilities, safety requirements, quality control measures, and inspection criteria for the installation of condensate drain piping associated with HVAC systems.
The objective is to ensure that condensate drain systems are installed in accordance with approved shop drawings, project specifications, manufacturer’s recommendations, and applicable international standards. Proper installation shall facilitate the effective removal of condensate from HVAC equipment without leakage, blockage, odor transmission, or water damage to the building.
Download Method Statement for Installation & Gravity Testing of Condensate Drain Piping System.
Download Package Contains:
- Method Statement
- Checklist for Installation
- Checklist for Gravity Testing
- Inspection & Testing Plan
- Quality Control Procedure QCP
- Risk Assessment.
You only need to change project name, insert logos and the document shall be ready for submission and approval from consultant/clients.
The files are in Word/Excel formats and instantly available after the payment.
Download Method Statement with Checklists, QCP, ITP & Risk Assessment


