The installation of base cabinets and wall cabinets shall be carried out by qualified personnel using approved materials, tools, and equipment in accordance with approved shop drawings, project specifications, manufacturer recommendations, and applicable international standards.
All works shall be subject to inspection, testing, and quality control procedures to ensure a high-quality and durable installation suitable for project handover.
Now you can download Method Statement for the installation of Base & Wall Mounted Cabinets.
Download Package Contains:
- Method Statement
- Checklists for Installation
- Inspection & Testing Plan
- Risk Assessment
The files are in Word/Excel formats and instantly available after you pay the cost of only 2.49$.
You only need to change project name, insert logos and the document shall be ready for submission and approval from consultant/clients.
Â
Below is the list of files that are included in download package.
Download Method Statement with Checklists, ITP & Risk Assessment.


