Sample Checklist for Inspection of Road works

Road Pavement Construction Inspection Checklist

Below is a sample checklist for inspection of road works which you can use for doing the inspection of road works.

Stage of work/Item Technical Parameters to be checked / ensured As per estimate At Site
 

 

 

 

 

 

Geometrics (verify irrespective of stage of work)

To check and ensure the following

a) Length

b) Roadway width ( 6.00m/7.50m)
c) Carriage way width (3.00m /3.75m)
d) Shoulder width (1.875m /1.50m)
e) CC pavement width
 

f) Camber of shoulders and embankment

( Range- 4 to 5% in case of Earthen road, 3.5 % to 4% in case of Gravel/WBM surface and 3 to 3.5% in case of BT surface)

 

 

 

Does not arise

 

Yes

 

No

Not adequately done
 

 

 

 

 

 

 

 

 

Sub Base / GSB

 

Thickness in “mm”

 

 

 

Whether the compaction is adequate

 

 

 

Does not arise

 

Yes

 

No

Not adequately

done

 

 

 

Whether Shoulder is compacted simultaneously along with the Sub base

 

 

 

Does not arise

 

Yes

 

No

Not adequately done

 

Stage of work/Item Technical Parameters to be checked / ensured As per estimate At Site
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Base course (WBM Gr

II/III or WMM)

Whether metal aggregates conform to required grading (in case of WBM construction)

Grading Requirement for WBM

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Grading requirement for WMM

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Does not arise

 

 

 

 

 

 

Yes

 

 

 

 

 

 

No

Sieve Size Percent by mass

passing

53.00 mm 100
45.00 mm 95-100
 

 

 

 

 

Not adequately done

26.50 mm
22.40 mm 60-80
11.20 mm 40-60
4.75 mm 25-40
2.36 mm 15-30
600 micron 8-22
75 micron 0-8
 

Material finer than 425 micron shall have plasticity Index (PI) not exceeding 6

Sieve size Percent by weight passing
Grading

I

Grading

II

Grading

III

125mm 100
90 mm 90-100 100
63mm 25-60 90-100 100
53 mm 25-75 95-100
45 mm 0-15 0-15 65-90
22.4 mm 0-5 0-5 0-10
11.2 mm 0-5

 

 

Stage of work/Item Technical Parameters to be checked / ensured As per estimate At Site
 

 

Whether the Volume of gravel is within 22% to 24% (in case of WBM construction)

 

 

 

Does not arise

 

Yes

 

No

 

 

 

 

 

 

 

 

 

 

 

Base course (WBM Gr

II/III or WMM)

Not

adequately done

Thickness (WBM/WMM)

WBM Gr.I   – 100 mm

 

Yes

WBM Gr.II -75 mm No
WBM Gr.III -75 mm Not

adequately done

 

 

 

Whether the compaction is adequate (Field density test)

 

 

 

Does not arise

 

Yes

 

No

Not adequately done
 

 

Whether Shoulder is compacted simultaneously along with the Base course

 

 

 

Does not arise

 

Yes

 

No

Not adequately done
 

 

 

Prime coat

/Tack coat

 

 

 

Whether WBM/WMM surface is properly cleaned before applying Prime coat/tack coat

 

 

 

Does not arise

 

Yes

 

No

Not adequately done

 

Stage of work/Item Technical Parameters to be checked / ensured As per estimate At Site
 

 

Prime coat

/Tack coat

 

Whether Prime coat/ tack coat is applied uniformly over the cleaned WBM/WMM surface before laying BT

 

 

Does not arise

Yes
No
Not adequately done
 

 

 

 

 

 

 

Bituminous layer

Thickness
 

 

 

% of Binder content

(Required – 4.32% , +/- 0.30%)

 

 

 

Does not arise

 

Yes

 

No

Not adequately done
 

 

 

Whether the compaction is adequate

 

 

 

Does not arise

 

Yes

 

No

Not adequately done
 

 

 

 

 

 

Road Furniture

 

 

Whether Name Board is provided

 

 

 

Does not arise

 

Yes

 

No

Not adequately

done

 

 

Whether KM stone and HM stone are properly fixed with concrete base

 

 

 

Does not arise

 

Yes

 

No

Not adequately done

 

Stage of work/Item Technical Parameters to be checked / ensured As per estimate At Site
 

 

Whether Sign board(s)/Cautionary Boards is provided

 

Yes

 

No

Not adequately done
 

Shoulder

 

Whether Gravel (or) excavated side earth (or) carted earth is provided for shoulder

 

 

 

Drainage

 

 

Whether Proper side drain is provided for avoiding stagnation of water along the road side

 

 

 

Does not arise

 

Yes

 

No

Not adequately done
 

 

 

 

 

 

 

 

 

Culverts

Number and location of culvert(s)
 

 

 

Whether the culvert(s) provided is adequate (or) necessary as per site condition

 

 

 

Does not arise

 

Yes

 

No

Not adequately done
 

 

Whether cross drain is properly integrated with the side drain

 

 

 

Does not arise

 

Yes

 

No

Not adequately done

 

Stage of work/Item Technical Parameters to be checked / ensured As per estimate At Site
 

 

 

Retaining wall

 

 

 

Whether the retaining wall provided is adequate in required location(s)

 

 

 

Does not arise

 

Yes

 

No

Not adequately done
 

Preparation of Bill

 

 

Whether bill is prepared without fail

 

Does not arise

 

Yes

 

No

 

 

 

 

Payment

 

Whether payment has been made upto the present stage

 

Does not arise

 

Yes

 

No

 

Whether Final payment has been made (For completed work)

 

Does not arise

 

Yes

 

No

 