The masonry block works shall be carried out by competent personnel using approved materials, equipment, and construction techniques in accordance with approved drawings, project specifications, applicable international standards, and manufacturer recommendations.
Continuous inspection, testing, quality control, and safety monitoring shall be maintained throughout the execution of the works to ensure structurally sound, durable, aesthetically acceptable, and defect-free masonry construction meeting all project requirements.
Now you can download Method Statement for Masonry Block Works.
Download package contains:
- Method Statement
- Checklist for Blockwork Installation
- Inspection & Testing Plan
- Risk Assessment
The files are in Word/Excel formats and instantly available after the payment.
You only need to change project name, insert logos and the document shall be ready for submission and approval from consultant/clients.


