The purpose of this Method Statement is to define the procedures, responsibilities, quality requirements, inspection criteria, testing requirements, and safety measures for the installation of the Lightning Protection System (LPS).
The objective is to ensure that the Lightning Protection System is installed safely and in accordance with approved shop drawings, project specifications, risk assessment reports, applicable international standards, local authority regulations, and manufacturer recommendations to provide effective protection against direct lightning strikes and transient overvoltages.
Download Method Statement for Installation of Lightning Protection System Including Earth Pits.
Download package contains:
- Method Statement
- Checklist for Installation
- Earth Pit Test Certificate
- Inspection & Testing Plan
- Quality Control Procedure QCP
- Risk Assessment
You only need to change project name, insert logos and the document shall be ready for submission and approval from consultant/clients.
The files are in Word/Excel formats and instantly available after the payment.
Below is the list of files that are included in download package.
Download Method Statement with Checklists, QCP, ITP & Risk Assessment.


