The purpose of this Method Statement is to define the procedures, responsibilities, safety requirements, quality control measures, inspection criteria, and installation methodology for the supply, handling, installation, testing preparation, and pre-commissioning of Dehumidifier Systems on construction projects.
The objective is to ensure that dehumidifier systems are installed safely and correctly in accordance with approved shop drawings, project specifications, manufacturer’s recommendations, applicable international standards, and consultant requirements to achieve the required indoor humidity control and operational reliability.
Download Method Statement for Installation Of Dehumidifiers.
The Download package contains:
- Method Statement
- Checklist for Installation
- Inspection & Testing Plan
- Installation Manual
Risk Assessment
The files are in Word/Excel formats and instantly available after the payment.
You only need to change project name, insert logos and the document shall be ready for submission and approval from consultant/clients.
Below is the list of files that are included in download package.

Download Method Statement with Checklists, ITP & Risk Assessment.


