The purpose of this Method Statement is to establish the procedures, responsibilities, inspection criteria, safety requirements, testing methods, and commissioning activities for Computer Room Air Conditioners (CRAC) and Close Control Units (CCU) serving critical environments.
The objective is to verify that the installed units operate safely, efficiently, and in accordance with approved shop drawings, project specifications, manufacturer’s recommendations, sequence of operation, and applicable international standards to maintain the required environmental conditions within mission-critical spaces.
Download Method Statement for Testing & Commissioning Of Closed Control Units CCU for Computer/MDF Rooms.
Download Package Contains:
- Method Statement
- Checklist for Pre Commissioning
- Checklist for Commissioning
- Inspection & Testing Plan
- Risk Assessment
The files are in Word/Excel formats and instantly available after the payment.
You only need to change project name, insert logos and the document shall be ready for submission and approval from consultant/clients.
Below is the list of files that are included in download package.
Download Method Statement with Checklists, ITP & Risk Assessment