Now you can download Method Statement for Installation of Aluminium Sliding Doors.
The installation of sliding doors shall be carried out by qualified personnel using approved materials, tools, and equipment in accordance with project specifications, approved shop drawings, manufacturer recommendations, and applicable international standards.
All works shall be subject to inspection, testing, and quality control procedures to ensure safe operation, durability, and compliance with project requirements.
Download Package Contains:
- Method Statement for Installation
- Checklists for Installation
- Inspection & Testing Plan
- Risk Assessment
The files are in Word/Excel formats and instantly available after the payment.
You only need to change project name, insert logos and the document shall be ready for submission and approval from consultant/clients.


