Download Method Statement for Installation Of Earthing & Bonding System & Accessories.
The download package contains:
- Method Statement
- Checklist for Installation
- Inspection & Testing Plan
- Risk Assessment
You only need to change project name and insert logos etc. and the same shall be ready to be submitted for approval from consultant/clients.
The files are in Word/Excel formats and instantly available after you pay the cost of only 2.49$.
Below is the list of files that are included in download package.
Download Method Statement with Checklists, ITP & Risk Assessment.
Discover more from Method Statement HQ
Subscribe to get the latest posts sent to your email.