The purpose of this method statement is to cover the steps for repairing of painting works on beam, column, slabs, and walls etc.
Overall...
Construction Documentation Portal
The purpose of this method statement is to cover the steps for repairing of painting works on beam, column, slabs, and walls etc.
Overall...
All paints to be used shall be those supplied by approved manufacturers. The quality of paints shall comply with MS 125 in respect of oil/ enamel...
Below is the painting method statement procedure for doing the painting works for internal wall painting.
This safe work method statement for...