Latest from our website
-
Inspection and Quality Control Questionnaires
Read more: Inspection and Quality Control QuestionnairesQ. What is QA/QC? QA/QC means, “Quality Assurance/Quality Control” the purpose of this (QA/QC) is to establish the sequence of requirement for the quality of material, quality of works, its inspection and records. Q. What are basic responsibilities of QA/QC personals? To ensure execution of works and comply fully as per standard and approved specs. […]
-
Sample Quality, Health, Safety and Environmental QHSE Policy
Read more: Sample Quality, Health, Safety and Environmental QHSE PolicyQHSE policy is a top level document that reflects the commitment of top management of a company to its intention of implementing the measures for achieving the quality and HSE targets and objectives. Above the policy there are two more documents which most organizations keep i.e. Mission and vision of the company. In additions a […]
-
Temporary Electrical Supply HSE Procedure For Construction Site
Read more: Temporary Electrical Supply HSE Procedure For Construction SiteBelow procedure will help you to establish a safe standard for the installation of temporary and permanent electrical fixtures/appliances on project sites. Overhead Cables: Overhead supply from the supply point or metering point to the distribution boards on the site should be of a robust pattern and preferably pliable and wire armoured with a further outer […]
-
Parapet Construction Method Statement
Read more: Parapet Construction Method Statement1. Scope This method statement is developed and issued to describe the procedure for parapet construction works to ensure that the work is planned and performed in accordance with technical specification and drawings. 2. Responsibilities The Project Manager will be responsible for global activities The work will be carried out under the responsibility of Construction […]
-
Health Safety Environment HSE Construction Site Establishment Procedure
Read more: Health Safety Environment HSE Construction Site Establishment ProcedureThe purpose of this procedure is to identify the key elements which need to be considered when setting up a new construction site and implementing the administrative arrangements for the start up of any project. Prior to commencement on site due consideration needs to be given for proper planning for safety, health and environmental requirements. […]
Document Categories
- Aluminium & Glass Work Methods (10)
- Building Management System (27)
- Civil Engineering Methods (165)
- Civil SWMS Downloads (36)
- Construction Method Statements (201)
- Download Method Statement (153)
- Duct Works (14)
- Electrical Downloads (45)
- Electrical Method Statements (97)
- Fire Fighting Downloads (9)
- Fire Suppression System (14)
- HVAC Downloads (43)
- HVAC Method Statements (101)
- Method Statement for Civil Works (120)
- Method Statements (380)
- Occupational Health and Safety (47)
- Piping Method Statements (33)
- Piping Works (33)
- Plumbing Downloads (26)
- Plumbing Method Statements (65)
- Pressure Testing (11)
- Preventive Maintenance (9)
- Project Planning (12)
- Pump Installation (4)
- Quality Management (44)
- Risk Assessment (27)
- Roadworks (22)
- Stainless Steel Fabrication (11)
- Technical Articles (64)
- Technical Calculations (3)
- Templates (25)
- Test Reports & Forms (13)
- Testing & Commissioning (102)
- Uncategorized (1)
Join other subscribers
Stay in the loop with everything you need to know.