Method Statement For Installation of Dampers VCD, FD and MFD

Installation Method For Volume Control Dampers

  • Before installation check any physical damages on the dampers.
  • Determine the position of the damper to be fixed on the duct from the construction drawing and check site conditions.
  • Fix the VCD in available space by flange or nut/bolt and apply duct sealant.
  • Examine the location for requirement of installation tolerances and clearances as specified in the drawings.
  • Manually move the volume control damper (VCD) to the desired position in a way that damper channel frame matches the duct flange.

Fire Damper installation method statement

 

 

 

Installation Method Statement For Fire Dampers

  • Before installation check any physical damages on the dampers
  • Determine the position of the Damper to be fixed on the duct from the construction drawings.
  • Fix the damper with flange or nutt/bolt and apply duct sealant.
  • Examine the location for requirement of installation tolerance and clearance as specified with the drawings.
  • Fire dampers should be installed in all fire rated walls, floors and partitions.
  • installation of Fire dampers should be¬†completed as per specification and manufacture recommendations
  • Each Fire damper¬†shall be provided with an access door to permit inspection and resetting of damper and adjacent duct works.
  • Provide duct access doors for internal access to all fire dampers for sizes bigger than 300 mm width of the duct.

Installation Method of Motorized Fire Dampers

  • Before installation check any physical damages on the dampers
  • Determine the position of the Damper to be fixed on the duct from the construction drawings.
  • Fix the damper with flange or nut /bolt and apply duct sealant.
  • Examine the location for requirement of installation tolerances and clearances as specified in the drawings.
  • Provide duct access doors for internal access to all dampers.
  • All fire dampers Installed will be as per applicable local and international standards.

 

 

 

 

 

 