Download Method Statement For Installation, Testing & Commissioning Of Wet Chemical Fire Suppression System For Kitchen Hoods

Method Statement For Installation, Testing & Commissioning Of Wet Chemical Fire Suppression System For Kitchen Hoods

 Download Package Contains the Method Statement +

Checklist for Installation +

Checklist for Testing & Commissioning +

Inspection & Testing Plan +

Risk Assessment

You only need to change project name and

insert logos etc and the same shall be

ready to be submitted for approval from consultant/clients.

Below is the list of files that are included in download package.

Method Statement For Installation T&C of Chemical Fire Suppression System

The files are in Word/Excel formats and instantly available after you pay the cost of only 3.99$.

 Download Method Statement with Checklists, ITP & Risk Assessment

Click Below “Buy” link and Download Instantly.




2Checkout.com Inc. (Ohio, USA) is a payment facilitator for goods and services provided by MethodstatementHQ.




secure-payment-with-paypal