Home » Method Statements » Construction Method Statements » HVAC Method Statements

HVAC Method Statements

Plate Heat Exchanger Installation Method

Plate Heat Exchanger Installation Method

Installation method statement for Plate Heat Exchanger Unless otherwise specified, all heat exchanger installation  shall be in accordance to  approved shop drawings and contract specifications. Drawing plans, schematics, and diagrams indicate general location and arrangement of Plate Heat Exchanger’s. Install  Plate Heat  Exchanger’s as indicated  unless deviations  to  layout  are approved on coordination drawings. Plate Heat Exchanger shall be installed on the …

Read More »

Bypass Terminal Reheat Units Testing & Commissioning Method

Pre-Commissioning Procedure Before starting the commissioning activities check and ensure that bypass Terminal Reheat units are installed as per the approved shop drawings and manufacturer’s instructions and approved. Check that sensing grids tubing connection from the grids to the transducers are correct & secure. Check for proper mounting of the actuator on the body of Bypass Terminal Reheat units. Check …

Read More »

Sprinkler System Installation Procedure

For sprinkler system pipe routing through walls and beams, make sure the appropriate sleeves are provided as per approval shop drawings and specification during the construction of structural elements. Fittings for the changes of direction or elevation shall be selected and installed as per the specification and approved shop drawings. Transfer the pipes from the stores to the areas which …

Read More »

Condensate Water Filter Installation Method Statement

The Condensate Water Filter (Side Stream/ Multimedia) are compact filtration packages for the removal of grit, airborne particles and scale from cooling tower water in order to avoid system fouling. A licensed and/or trained/experienced plant electrician and millwright-pipe fitter should install this packaged system. Ensure that the concrete pad is level and structurally sound to accommodation the weight of the …

Read More »

Method Statement for Chemical Cleaning of Carbon Steel Pipelines

Chemical Cleaning will be done to remove the storage and assembly rusting, Protective greases and oils, Mill  scale, Welding slag, Dust, Dirt, Scale and most protective coatings from pipes and other atmospheric or contact erection residue. After completion of chemical cleaning  and  restoration, CS pipes will  be preserved / filled with nitrogen gas in order to avoid further rusting. Physical residues …

Read More »