Below is an important workplace health and safety procedure related to COSHH, that details the requirements for the establishment and maintenance of...
Latest additions !
Central Battery Emergency Lighting System – Electrical Installation Method Statement
This document describes the methodology for the installation of emergency Lighting central battery System in any kind of project.
Following this...
MV Switchgear Installation Method Statement
This method statement for installation of medium and low voltage switchgear and panels boards on site is prepared to define the method used to...
Driven Piles Installation Method Statement
The piling contractor shall submit to the consultant the piling forms and formats for approval prior to the commencement of piling works.
Piling...
Mechanical Engineering Interview Questions and Answers
Below we have given around 70 questions and answers that can be helpful for mechanical engineer interview.
Q.1) What is the Unit of Heat?
Units:...
Best Sanitary Installation Method Statement
This document describes best method for the sanitary installation to ensure that the installation works are conducted in compliance with the...
Embankment Construction Method Statement Including Soil Stabilization & Granular Sub Base
Below is a precise roadwork method statement that covers construction of embankment including soil stabilization and sub base preparation, with...
Piping Installation, Welding & Fabrication Method Statement
TABLE OF CONTENTS
PURPOSE
SCOPE
REFERENCES
DEFINITIONS
RESOURCES
RESPONSIBILITIES
SEQUNCE OF WORKS
QA/QC...
Permit to Work PTW System General Requirements and Improvement Plan
This document is prepared to provide a clear explanation about PTW issuance and to exemplify the PTW required activities at a construction or any...
Generator Installation Method Statement Including Fuel Tank Installation at High Level
This method statement covers the generator and fuel tank installation for any kind of project.
Prior to commencement of the works, all activities...
Termination of Fiber Optic Cables
This fiber optic installation method statement covers the termination of fiber optic cables with patch panel, network distribution cabinet NDC and...
Method Statement for Dry Lean Concrete – Roadworks
Below road works method statement covers the construction of Dry Lean Cement concrete sub-base for cement concrete pavement in accordance with...
Method Statement for Wet Mix Macadam (WMM) on Granular Sub Base
This macadam work method statement covers laying and compacting clean, crushed, graded aggregate and granular materials premixed with water into a...
Method Statement for Concrete Sampling and Testing
This method statement is applicable for collecting samples for concrete before and during concrete pouring activities and doing the standard...
Method Statement for Split AC Installation of DX Split and Packaged Units
Below is the a detailed split ac installation method statement covering the installation of DX Split Units and packaged units including the...